Building Department
Operation Details
Omar P. Gullen – Mechanical Inspector
Elio Alvarez – Chief Electrical
Miguel Arronte – Building Inspector
All inspections are done on Tuesdays and Thursdays between 10:00 am and 12:00 pm. The building official is available on Mondays and Wednesdays from 10:00 am to 12:00 pm.
The Building Department can be reached by calling Village Hall at 305-795-7880.
Terrafly is a public service of Florida International University (FIU) sponsored by the National Science Foundation (NSF), NASA, United States Geological Survey (USGS), and IBM. This service provides online interactive maps and geographical information to the public. The Village of El Portal’s Terrafly customized system allows the users to navigate over the entire Village searching for geographical information and associated data such as demographics, locations, services, restaurants, parcels, MLS real state listing, environmental, and others.
References in this web site to any specific commercial products, process, service, manufacturer, or company does not constitute its endorsement or recommendation by the Village of El Portal. The Village of El Portal is not responsible for the contents of any “off-site” web page referenced from this server.
Preparing your building for a hurricane
It is never too early to prepare for hurricane season. The Florida Building Code requires that the owner, occupant or user of a property take precautions for the securing of buildings and equipment. We encourage you to look at the information provided below, or if you have additional questions or concerns, call our department.
Sec. 8-16. – Special Hurricane Inspections.
(a) During such periods of time as the National Weather Service has issued a severe weather advisory that is in effect for Miami-Dade County, best efforts must be used so that all furniture, display racks, material and similar loose objects in exposed outdoor locations, including loose material of projects under construction are secured or otherwise appropriately braced to rigid construction or stored in buildings to the extent practicable given the conditions. Orders shall be oral or written and shall be given to any person on the premises most logically responsible for maintenance and such orders shall be carried out before winds of tropical storm velocity are anticipated.
(b) After winds of the velocity associated with a severe weather event are experienced and have subsided, the Building Official shall investigate to determine if damage has occurred to buildings or other structures.
(c) No building or other structure or assembly or part thereof, which was damaged or collapsed or out of plumb or line shall be repaired or altered or otherwise returned to its original position without inspection and approval by the Building Official.
(d) For the purposes of this section, “severe weather advisory” shall be defined as any one of the following: a tropical storm warning, a hurricane watch, or a hurricane warning and the term “severe weather event” shall be defined as a tropical storm or hurricane.
(Ord. No. 01-112, § 1, 7-10-01; Ord. No. 06-7, § 1, 1-24-06)
Also, please visit the “Departments” Home page for additional Emergency Resources information.

